Versions Compared
compared with
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Release date
Base System
- Ability to do large exports in the background
- Show user name and surname in drop down fields
User Interface
- Ability to scroll through attachments in the communication thread be clicking previous and next buttons
- Ability to download all of the attachments in a single ZIP file
- Bug fix on kanban cards with long names
CRM
- Added stage requirements field that will guide new users on what actions should be taken at each step of the sales process
SMS
- Revamp of the entire module making it faster and more accurate
- Added support for two SMS providers: Panacea and InfoBip
Project Management
- Hide subtasks from the kanban view
- Do not take subtasks into account when calculating the total open tasks on a project
- Added a subtasks progress bar on kanban card of each tasks
Project Issue
- Added issue type
Credit Check
- Fixed bug where ID Number wasn't auto-populating
Technical release
- Base 1.15
- SMS 1.2
- LMS 2.2.1
Code report
Report | Result |
---|---|
Coverage | 58% |
PEP8 | 1365 |
Pylint | 8.27 |
Modules affected
Module | Action |
---|---|
base_export_async | Install |
campaign_sms | Upgrade |
crm_partner | Upgrade |
im_livechat_extend | Install if required |
project_issue_type | Install if required |
project_partner | Upgrade |
project_subtask | Upgrade |
project_timesheet_extend | Install if required |
sms | Upgrade |
sms_infobip | Install if required |
sms_panacea | Install if required |
web_preview | Upgrade |
web_taskflow | Upgrade |